Bluepilot2003
70cc twin V2
Hi all,
This is my first buld thread. I do have 5 kits under my belt. This will be my first short kit and first giant scale/gas airplane. Thanks Chris for finding this for me. It looks like it will be amazing when I get her done. Thanks Rob for making the short kit for me.
I currently do no thave a building table good enough for this build so I will need to make one of those as well. I am planning a hollow core door with ceiling tiles as the building surface. The last week of the month, I plan on actually building the table. Pictures to follow. Here is the progress so far on this project...
Plans printed from FedEx: $83 with military discount
Ceiling tiles ordered from Amazon using reward point
I have a pretty good LHS to use for resources on this build, so that part of this process should be exciting and easier than I am used to. And as I am in Tucson, weekends are meant for flying! So this will be a night build pretty much exclusively.
Attached are pictures of of my current work station and of what I have ready for this build.
This is my first buld thread. I do have 5 kits under my belt. This will be my first short kit and first giant scale/gas airplane. Thanks Chris for finding this for me. It looks like it will be amazing when I get her done. Thanks Rob for making the short kit for me.
I currently do no thave a building table good enough for this build so I will need to make one of those as well. I am planning a hollow core door with ceiling tiles as the building surface. The last week of the month, I plan on actually building the table. Pictures to follow. Here is the progress so far on this project...
Plans printed from FedEx: $83 with military discount
Ceiling tiles ordered from Amazon using reward point
I have a pretty good LHS to use for resources on this build, so that part of this process should be exciting and easier than I am used to. And as I am in Tucson, weekends are meant for flying! So this will be a night build pretty much exclusively.
Attached are pictures of of my current work station and of what I have ready for this build.