Xpress
GSN Sponsor Tier 1
Right I get that, but your equipment should be able to balance your packs correctly.
It won't be able to balance each of the individual cells. You're paralleling several sets of cells and if there are variances in voltages between them then you're set for disaster. We at Hitec never recommend them (certainly not for any of our chargers), and I personally would never suggest them.
I always dedicate one channel per battery as that is how chargers are designed- to charge one battery at a time per channel. It is the safest method to charge, and when you are using a volatile piece of equipment you can never be too safe
You guys sure are good at thread derailment
Last edited by a moderator: