sweetpea
100cc
I hope you all learn from my mistakes!
So I called the County and I guess there was like 3 inspections I was supposed to have done already. I thought my builders/electricians would schedule these. Framing, Electric, Trenching, final electric/bldg.
I have an inspector coming tomorrow for the Trenching and anything else I can convince him to do. My electrician is sending in his info today (so he says) but he has to also pay for it to be official. I am going to talk with the inspector about what I need to do to finalize everything as soon as I can and what my steps are if for some reason the electrician never registers with the County (just in case).
I'm going tonight to get some logs from HD to start framing in the gravel around the bldg. I don't need a permit for that!
So I called the County and I guess there was like 3 inspections I was supposed to have done already. I thought my builders/electricians would schedule these. Framing, Electric, Trenching, final electric/bldg.
I have an inspector coming tomorrow for the Trenching and anything else I can convince him to do. My electrician is sending in his info today (so he says) but he has to also pay for it to be official. I am going to talk with the inspector about what I need to do to finalize everything as soon as I can and what my steps are if for some reason the electrician never registers with the County (just in case).
I'm going tonight to get some logs from HD to start framing in the gravel around the bldg. I don't need a permit for that!