• If you are new to GiantScaleNews.com, please register, introduce yourself, and make yourself at home.

    We're 1st in Giant Scale RC because we've got the best membership on the internet! Take a look around and don't forget to register to get all of the benefits of GSN membership!

    Welcome!

Scale Nelitz 1/3 scale Cub build

dhal22

GSN Sponsor Tier 1
More. I suppose I will Hysol the firewall to the tubing behind. Maybe through bolt it to the tubing.

20191006_201217.jpg




20191006_201236.jpg
 

dhal22

GSN Sponsor Tier 1
One side is leaning out a 1/4" or so and needs to be drawn in. Couldn't use the opposite side as its not strong enough to keep from being drawn in itself. Figured out a way pull it in though. All thread and washers make for a good screw jack.

20191007_201953.jpg



20191007_201959.jpg
 

TonyHallo

150cc
A couple photos from the Piper museum in Lock Haven PA that may be of interest. Note the tabs for bolting the firewall.
 

Attachments

  • 000_0340.JPG
    000_0340.JPG
    598.7 KB · Views: 331
  • 000_0341.JPG
    000_0341.JPG
    598.6 KB · Views: 291

dhal22

GSN Sponsor Tier 1
Nice job enjoy following this build. This is one difficult and time consuming build not very many people will take on a build like this. Great work

I thought 4 years to build this originally. I started February (?) 2018 so approaching end of year 2. I think 4 is still a good estimate.
 
Top