Early this morning, 5:30 am. I spent one more hour. I was able to place the formers (F4-F7) and glue on the stringers and the bottom ply brace.
Placement of the servo rails in the tail segment, and the remaining formers.
Placement of the stringers. There is one full stringer from F1 to F9. there is doubler from F1 to the front of F5, but not engaged into F5.
There is a tiny gap between F3 and the Fuselage Side.
this is after placement of both stringers on both sides, and right before placement of the bottom plywood brace cap.
This is best done with an assistant.
here is the plywood bottom brace cap on. SO easy!! just snaps into place.
after this step, time to wipe off all the extruded glue and place clamps everywhere!