dhal22
GSN Sponsor Tier 1
Thanks for that link. Got to get back on my Cub build asap.
Had snow flurries last night, building season has officially began in South Western Pennsylvania!
It sure has turned here in Eastern Idaho!
I did a dry run on the ribs, just to make sure I've got all the holes drilled that I need. I'm going to go ahead and make the top of the wing tip flat with the top of the wing, as the plans indicate. I think I'm ready to start gluing! I also cut some servo mounts out of 1/4 X 1/2" spruce. Also cut a new full length trailing edge.
I love it when a plan, or a plane, comes together!